Questions clients ask before work begins.

Should we specify Cat6 or Cat6A?

The correct choice depends on required performance, pathway conditions, connected devices, budget and the expected life of the building.

Read the detailed answer

What should a structured-cabling handover include?

A useful handover should identify every installed link and provide the evidence another technical team needs to operate and maintain it.

Read the detailed answer

Can network cabling be installed in an occupied building?

Yes, provided access, safety, noise, dust, business continuity and reinstatement are planned before work begins.

Read the detailed answer

Do we need single-mode or multimode fibre?

The decision depends on distance, active equipment, bandwidth, upgrade plans, existing standards and the economics of the complete link.

Read the detailed answer

What does OTDR testing prove?

OTDR testing shows events and loss along a fibre route, helping locate splices, connectors, bends, damage and unexpected attenuation.

Read the detailed answer

How quickly can LGN respond to a fibre fault?

Response depends on location, access, current commitments, spares and whether the route can be safely reached and isolated.

Read the detailed answer

Can LGN work in a live data centre?

Yes, when the change is governed by an agreed method, ownership, access controls, rollback plan and precise identification.

Read the detailed answer

Should we remediate an existing network or replace it?

Test evidence, condition, capacity, supportability and business risk should decide—not appearance alone.

Read the detailed answer

What infrastructure is needed for business Wi-Fi?

Business Wi-Fi needs correctly positioned data cabling, appropriate PoE, suitable mounting, switch capacity and coordination with the wireless design.

Read the detailed answer

Can CCTV and access-control cabling share a project with the data network?

Yes. Coordinating the systems can reduce duplicated routes and programme clashes, while their technical and security requirements remain distinct.

Read the detailed answer

When should cabling be involved in an office fit-out?

Cabling should be coordinated during design and builder’s-work planning, before ceilings, floors and furniture decisions close off practical routes.

Read the detailed answer

Can LGN work as a white-label delivery partner for an MSP?

Yes. LGN can deliver the physical layer while respecting the MSP’s client relationship, scope, reporting line and communication rules.

Read the detailed answer