Clients & Projects

Amazon

Project Background

Amazon have grown to become one of the world’s largest companies and among the first to integrate such innovative cutting edge distribution fulfilment methods. To accommodate their unprecedented growth and allow for the handling and fulfilment of stock levels, the likes of which has never been seen before, it has been necessary for Amazon to build worldwide distribution hubs as part of the most efficient large scale delivery system available today.

Project Scope

Delivery of structured cabling and technical services installation across 5 distribution centres, inclusive of cabinets, switching kit, 3000-6000 copper data points, up to 10km of fibre per site, up to 300 Wi-Fi access points and CCTV cameras .

Project Outcome

Successful delivery within timescales and budget.

ASDA

Project Background

Asda have forged themselves as a leading supplier of home essentials and a true giant amongst worldwide retailers. Speed and capability of their network is paramount to the success of the organisation with over 630 stores throughout UK of varying scale and bandwidth demands.

Project Scope

Install a high bandwidth Category 6a solution and 10gbps Wi-Fi throughout nationwide stores. LGN managed delivery throughout Northwest stores with over 500 data points, 500 access points, associated fibre links, cabinet upgrades and switching equipment.

Project Outcome

Significantly increased bandwidth throughout the estate. Increased reliability of network and dependent systems. Increased staff and customer satisfaction and retention.

Barclays

Project Background

Radbroke Technology Centre has been the home of Barclays since 1972 with over 4000 staff sited at these premises. It became clear there was a requirement for expanded modular office space until their planning had been processed for a built extension on premises.

Project Scope

Install 1000+ point premium category 6 solution from modular building to existing comms room, inclusive of refreshed fibre links and category 6 harness looms.

Project Outcome

Successful delivery of project, ahead of time and within budget, granting the ability to house additional staff at the Radbroke facility.

BBC

Project Background

The BBC has been operational at MediaCityUK since 2011, producing thousands of hours of content for television, radio and online. Around 3,200 staff work in twenty-six departments, producing thousands of hours of content for television, radio and online. The ever expanding increase in quality of content means that the networks at Media City must be among some of the best performing in the country.

Project Scope

Install 1500m of diverse fibre links throughout the BBC North estate.

Project Outcome

Project delivered ahead of time and within budget with minimal disruption to staff and the public within a very active site.

EDF

Project Background

EDF are Britain’s biggest generator of zero carbon electricity from wind, nuclear and solar facilities. Our works with EDF are most of the time of a sensitive nature, with a planned nuclear outage once per year requiring maintenance delivered within stringent deadlines.

Project Scope

Install and refresh over 2km of fibre optic links throughout site.

Project Outcome

Successful delivery of project within budget and time constraints.

Hilton

Project Background

With the ever increasing demand for speed, reliability and bandwidth, it is only natural that one of the world’s leading Hoteliers sought to install comprehensive wireless solutions throughout their Doubletree estate, which includes over 500 hotels worldwide.

Project Scope

Supply and install cabling and Wi-Fi solution in Doubletree hotels throughout the Northwest, inclusive of over 100 access points, 1km of fibre optic links, associated cabinet and switching equipment.

Project Outcome

Successful delivery of project within budget and time constraints, increased customer satisfaction and retention.

HMRC

Project Background

HMRC sought the establishment of a new HQ for their DBS checking facility in the Northwest to accommodate up to 400 staff.

Project Scope

Supply and install multi-layered 1400 point category 6 solution, inclusive of inter-cabinet fibre links, Wi-Fi, CCTV, door access systems associated cabinets and switching equipment.

Project Outcome

Successful project delivery within budget and timeline constraints.

HMRC

Project Background

HMRC sought the establishment of a new hub in Liverpool to accommodate up to 4000 staff.

Project Scope

Installation of 7000 point category 6a solution, inclusive of over 10km of fibre links, cabinet assemblies, Wi-Fi, CCTV, door access systems and switching kit.

Project Outcome

Successful project delivery within budget and timeline constraints.

Hubron

Project Background

Hubron are a worldwide leading manufacturer of plastic masterbatch and conductive compound. Their exponential growth has created the need for additional production facility and offices on site.

Project Scope

Full fit out of production, engineering and office areas with cabinets, switching, Meraki Wi-Fi, blown fibre links and copper data throughout the building.

Project Outcome

Successful project delivery within allocated time and budget.

NHS

Project Background

Nobody expected to see a global pandemic the scale of Covid-19. It was very clear, very quick that we all had to pull together to ensure the best safety measures for our loved ones and ourselves. Part of the countries plan of action was the construction of temporary emergency hospital facilities across the country to best cope with whatever this situation may have sent our way.

Project Scope

Install 1800 cat 6 copper data points, cabinets, switching kit and associated fibre links.

Project Outcome

Project successfully turned around in 5 days.

OBG

Project Background

The O’Brien Group of companies provide products and services in science led fields. OBG procured LGN for our first project as a newly formed company and have used us for cabling services across their estate ever since. There are many notable projects including a reinstall of their Runcorn MCR, the fit out of their new Liverpool head office, the fit out of their new offices in Dublin, directional Wi-Fi, fibre links and data throughout the leisure park in Scarisbrick and many more.

Project Scope

LGN supply OBG with all level of projects from fault find and fix through to full scale structured cabling design and delivery across the estate.

Project Outcome

Successful project completion within timelines and budget.

Staffordshire University

Project Background

Staffordshire University are committed to providing all students, colleagues and visitors with the best best possible experiences. Part of this initiative included the building of a £40m flagship physical and virtual hub to connect employers, students and apprentices across the Midlands and beyond.

Project Scope

Splice and test over 3000 points of connection spanning throughout 8-196f fibres.

Project Outcome

Successful project completion within timelines and budget.

The Hut Group

Project Background

THG started as an ambitious Manchester based start-up to become one of the leading pioneering brands in healthcare, supplementary and marketing services. Their exponential growth has seen the need for a £1.4 billion new headquarters being built in Manchester.

Project Scope

Splice and test over 3000 fibre optics links spanning throughout 8-196 core fibres.

Project Outcome

Successful project completion within timelines and budget.

The University of Manchester

Project Background

The Manchester Engineering Campus Development (MECD) is one of the single, largest construction projects undertaken by any UK higher education institution. The development for the University of Manchester will provide over 75,000m2 of modern facilities in a bespoke environment, to support world leading research and an outstanding teaching and learning experience for more than 8,000 students and staff.

Project Scope

Install 3km of blown fibre sub duct, tubing and blown fibres between existing and new infrastructure.

Project Outcome

Successful completion within budget and timescales.